No. Masons ought to be restricted & transit mixer operators ought not to be forced to add water. Consequences of such actions could be severe. Properly designed ready mixed concrete contains optimum water. If the workability (slump) of ready mixed concrete is not as expected, the RMC supplier should be informed. If required, dosing of admixtures along with a small quantity of water would be done by the RMC supplier’s technical personnel.